| Location and straight alignment of the first course
is important. Place a mark 3/4" plus the width of flooring
(3" for 2 1/4" flooring) on the end wall near a corner
of starting wall. Place similar mark at opposite corner and insert
nails into each mark. Pull string line between nails. Nail the first
strip with its leading edge on this line.
The gap between that strip and the wall is needed for expansion
space and will be hidden by the shoe mold.
If you're working with screeds on slab make the same measurements
and stretch a line between nails. Remove line after you get the
starter board in place.
Lay the first strip along the starting string line, tongue out,
and drive 6d or 8d flooring nails or casing nails (galvanized
or screw shank hold best) 1" from the grooved edge. Nails
should be driven into the top surface of strips and counter sunk
(face nailing). Position nails over supporting joists, and near
ends of strips or into each screed crossed. Keep the starter strip
aligned with the string line. (Pre-drilling nail holes will prevent
splits.) Also, blind nail starting strip through the tongue according
to nailing schedule.
* Always follow manufactures directions
|